Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
962
matching recommendationsNAICS | 32521 | Resin and Synthetic Rubber Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0609 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $38,174 | $25,504 | n/a |
UF0609 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,360 | $25,380 | n/a |
UF0609 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $3,546 | $9,000 | n/a |
UF0609 # 07 Y:2024 | 07 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $21,071 | $25,000 | n/a |
UF0609 # 04 Y:2024 | 04 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $14,767 | $40,488 | n/a |
UF0609 # 06 Y:2024 | 06 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $35,940 | $0 | n/a |
UF0609 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $104,116 | $322,608 | n/a |
GT0971 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,890 | $1,850 | n/a |
GT0971 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $137,329 | $2,565,299 | n/a |
GT0971 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $1,025 | $5,227 | n/a |
GT0971 # 02 Y:2023 | 02 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $3,384 | $400 | n/a |
GT0971 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,705 | $17,982 | n/a |
GT0971 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,632 | $867 | n/a |
OR0772 # 02 Y:2023 | 02 | 2023 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,363 | $1,352 | Not Implemented |
OR0772 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,514 | $8,385 | Implemented |
OR0772 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $5,801 | $7,178 | Not Implemented |
OR0772 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,304 | $25,167 | Not Implemented |
OR0772 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $1,740 | $3,039 | Implemented |
OR0772 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $1,312 | $5,390 | Implemented |
UD1063 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $461 | $952 | n/a |
UD1063 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $170 | $200 | n/a |
UD1063 # 04 Y:2023 | 04 | 2023 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $4,227 | $2,191 | n/a |
UD1063 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $760 | $0 | n/a |
UD1063 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,244 | $297 | n/a |
UD1063 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,201 | $2,583 | n/a |