IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

419

matching recommendations
Reset
NAICS 32521 Resin and Synthetic Rubber Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0788 # 01 Y:2024 01 2024 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $126,866 $2,500,000 Implemented
OR0772 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,514 $8,385 Implemented
OR0772 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $1,312 $5,390 Implemented
OR0772 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $1,740 $3,039 Implemented
UD1062 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,152 $2,000 Implemented
WV0650 # 08 Y:2023 08 2023 DEVELOP A REPAIR/REPLACE POLICY $4,052 $8,935 Implemented
WV0650 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,350 $15,114 Implemented
WV0650 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $10,058 $35,930 Implemented
WV0650 # 10 Y:2023 10 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $136 $388 Implemented
WV0650 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,595 $891 Implemented
WV0650 # 07 Y:2023 07 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,598 $1,500 Implemented
UL2304 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,246 $1,300 Implemented
UL2304 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,568 $26,328 Implemented
WM0202 # 04 Y:2023 04 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,975 $5,360 Implemented
WM0202 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,098 $13,750 Implemented
WM0202 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,708 $2,511 Implemented
KS2316 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,336 $29,920 Implemented
KS2316 # 01 Y:2023 01 2023 REPAIR AND ELIMINATE STEAM LEAKS $11,534 $2,766 Implemented
KS2316 # 09 Y:2023 09 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $49,691 $246,356 Implemented
KS2316 # 10 Y:2023 10 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,892 $156,412 Implemented
WV0643 # 03 Y:2023 03 2023 INSTALL SET-BACK TIMERS $3,513 $1,125 Implemented
WV0643 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $4,345 $8,691 Implemented
WV0643 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $1,534 $2,013 Implemented
WV0643 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $829 $2,567 Implemented
WV0643 # 10 Y:2023 10 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $73 $215 Implemented