IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 32521 Resin and Synthetic Rubber Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0643 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $34,280 $75,000 Not Implemented
NC0643 # 03 Y:2019 03 2019 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,881 $30,000 Not Implemented
NC0643 # 02 Y:2019 02 2019 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $9,495 $1,000 Implemented
NC0643 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,445 $139,040 Implemented
NC0643 # 05 Y:2019 05 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $77,463 $300,000 Not Implemented
NC0461 # 08 Y:2012 08 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $458,904 $314,375 Implemented
NC0461 # 07 Y:2012 07 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $41,556 $15,000 Not Implemented
NC0461 # 06 Y:2012 06 2012 REDUCE EXCESSIVE BOILER BLOWDOWN $4,695 $0 Implemented
NC0461 # 05 Y:2012 05 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $84,150 $40,000 Implemented
NC0461 # 04 Y:2012 04 2012 ADJUST BURNERS FOR EFFICIENT OPERATION $24,541 $2,400 Implemented
NC0461 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $81,960 $300,000 Not Implemented
NC0461 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,912 $7,160 Implemented
NC0461 # 01 Y:2012 01 2012 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $163,689 $410,000 Not Implemented
NC0438 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $1,416 $2,112 Implemented
NC0438 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,224 $300 Implemented
NC0438 # 06 Y:2011 06 2011 DEVELOP A REPAIR/REPLACE POLICY $5,515 $5,548 Not Implemented
NC0438 # 05 Y:2011 05 2011 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $43,023 $92,800 Not Implemented
NC0438 # 04 Y:2011 04 2011 REPAIR OR REPLACE STEAM TRAPS $19,936 $5,500 Not Implemented
NC0438 # 03 Y:2011 03 2011 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $19,068 $32,000 Not Implemented
NC0438 # 02 Y:2011 02 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,972 $7,800 Implemented
NC0438 # 01 Y:2011 01 2011 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $62,448 $94,000 Not Implemented
NC0287 # 01 Y:2004 01 2004 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $10,282 $9,879 Not Implemented
NC0287 # 05 Y:2004 05 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,915 $750 Implemented
NC0287 # 04 Y:2004 04 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,732 $700 Implemented
NC0287 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $615 $100 Implemented