Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,065
matching recommendationsNAICS | 32521 | Resin and Synthetic Rubber Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0475 # 03 Y:2004 | 03 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,390 | $500 | Implemented |
AM0475 # 04 Y:2004 | 04 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,170 | $4,600 | Not Implemented |
AM0475 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,100 | $300 | Implemented |
AM0475 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,020 | $33 | Implemented |
AM0475 # 07 Y:2004 | 07 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,290 | $400 | Not Implemented |
AM0475 # 08 Y:2004 | 08 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,490 | $900 | Implemented |
AM0475 # 09 Y:2004 | 09 | 2004 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,600 | $12,500 | Not Implemented |
AM0475 # 10 Y:2004 | 10 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,740 | $425 | Implemented |
AM0475 # 11 Y:2004 | 11 | 2004 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $572 | $699 | Not Implemented |
AM0475 # 12 Y:2004 | 12 | 2004 | INSULATE BARE EQUIPMENT | $450 | $60 | Not Implemented |
UF0350 # 01 Y:2004 | 01 | 2004 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $22,657 | $60,000 | Not Implemented |
UF0350 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,654 | $10,151 | Implemented |
UF0350 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $17,652 | $1,339 | Not Implemented |
UF0350 # 04 Y:2004 | 04 | 2004 | INSTALL SKYLIGHTS | $12,961 | $9,706 | Implemented |
UF0350 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,068 | $1,610 | Implemented |
UF0350 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $563 | $1,750 | Not Implemented |
UF0350 # 07 Y:2004 | 07 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,988 | $0 | Not Implemented |
UF0350 # 08 Y:2004 | 08 | 2004 | RECYCLE FLUORESCENT LAMPS | $1,968 | $3,496 | Not Implemented |
UF0350 # 09 Y:2004 | 09 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $4,200 | $0 | Not Implemented |
UF0350 # 10 Y:2004 | 10 | 2004 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,795 | $3,000 | Implemented |
LE0196 # 01 Y:2004 | 01 | 2004 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $63,437 | $239,000 | Not Implemented |
LE0196 # 02 Y:2004 | 02 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $27,869 | $27,000 | Not Implemented |
LE0196 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $19,639 | $5,000 | Implemented |
LE0196 # 04 Y:2004 | 04 | 2004 | MINIMIZE WATER USAGE | $16,092 | $2,000 | Not Implemented |
LE0196 # 05 Y:2004 | 05 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,917 | $57,000 | Implemented |