IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

372

matching recommendations
Reset
NAICS 325211 Plastics Material and Resin Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0026 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,086 $19,000 Implemented
UW0026 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,037 $0 Implemented
UW0026 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,715 $200 Implemented
UW0026 # 06 Y:2009 06 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,522 $19,854 Implemented
OR0534 # 03 Y:2008 03 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,794 $0 Implemented
OR0534 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $6,768 $6,825 Implemented
OR0534 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $271 $0 Implemented
OR0534 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $1,219 $2,510 Implemented
OR0534 # 10 Y:2008 10 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $447 $808 Implemented
DL0017 # 03 Y:2008 03 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,007 $800 Implemented
DL0017 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,006 $26,496 Implemented
UD0767 # 01 Y:2007 01 2007 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $30,284 $1,500 Implemented
UD0767 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,625 $2,175 Implemented
LE0264 # 01 Y:2007 01 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,680 $50,000 Implemented
LE0264 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,103 $2,500 Implemented
LE0264 # 03 Y:2007 03 2007 INSTALL TIMERS AND/OR THERMOSTATS $4,204 $2,000 Implemented
LE0264 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,084 $500 Implemented
LE0264 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,184 $2,500 Implemented
LE0264 # 10 Y:2007 10 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,288 $1,000 Implemented
UD0755 # 01 Y:2007 01 2007 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $73,500 $147,000 Implemented
UD0755 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,728 $10,396 Implemented
UD0755 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,952 $19,500 Implemented
UD0755 # 07 Y:2007 07 2007 UPGRADE CONTROLS ON COMPRESSORS $12,600 $15,000 Implemented
UD0755 # 09 Y:2007 09 2007 RECOVER WASTE HEAT FROM EQUIPMENT $11,340 $2,000 Implemented
UD0755 # 12 Y:2007 12 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,928 $42,500 Implemented