IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
NAICS 32522 Artificial and Synthetic Fibers and Filaments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0270 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,638 $395 Implemented
IC0277 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $1,974 $5,963 Implemented
IC0277 # 03 Y:2023 03 2023 REPAIR AND ELIMINATE STEAM LEAKS $8,672 $1,280 Implemented
IC0277 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $5,585 $3,405 Implemented
GT0938 # 01 Y:2019 01 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $14,349 $2,000 Implemented
GT0938 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,092 $3,500 Implemented
GT0938 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,814 $18,557 Implemented
GT0933 # 01 Y:2019 01 2019 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $10,455 $250 Implemented
GT0933 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $199 $213 Implemented
GT0933 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $32,851 $41,392 Implemented
GT0933 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,768 $9,616 Implemented
NC0559 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $109,787 $1,000 Implemented
NC0559 # 10 Y:2016 10 2016 USE PHOTOCELL CONTROLS $1,339 $1,600 Implemented
NC0559 # 03 Y:2016 03 2016 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $4,003 $1,000 Implemented
NC0559 # 06 Y:2016 06 2016 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,950 $25,000 Implemented
NC0559 # 07 Y:2016 07 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $34,146 $10,000 Implemented
NC0559 # 08 Y:2016 08 2016 REPAIR AND ELIMINATE STEAM LEAKS $7,231 $2,000 Implemented
NC0559 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,038 $320 Implemented
NC0559 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $494 $347 Implemented
NC0559 # 15 Y:2016 15 2016 DEVELOP A REPAIR/REPLACE POLICY $2,264 $4,256 Implemented
NC0559 # 13 Y:2016 13 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,085 $1,000 Implemented
MS0360 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $91,795 $240,500 Implemented
MS0362 # 01 Y:2010 01 2010 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $129,172 $586,857 Implemented
UA0048 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $6,421 $0 Implemented
UA0048 # 02 Y:2010 02 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $486 $0 Implemented