IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
NAICS 32522 Artificial and Synthetic Fibers and Filaments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0559 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $109,787 $1,000 Implemented
MS0360 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $91,795 $240,500 Implemented
MS0362 # 01 Y:2010 01 2010 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $129,172 $586,857 Implemented
UA0048 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $3,976 $728 Implemented
UA0048 # 02 Y:2010 02 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $486 $0 Implemented
UA0048 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $6,421 $0 Implemented
UA0048 # 05 Y:2010 05 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,545 $0 Implemented
UA0048 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $2,000 Implemented
LL0279 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $132,215 $49,640 Implemented
UF0392 # 01 Y:2006 01 2006 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $32,112 $2,775 Implemented
UF0392 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,311 $8,824 Implemented
UF0392 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,532 $585 Implemented
AS0430 # 04 Y:2006 04 2006 INSTALL SKYLIGHTS $782 $4,400 Implemented
AS0430 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $3 $1,077 Implemented
AS0430 # 02 Y:2006 02 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,545 $7,500 Implemented
UF0380 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $388,094 $48,067 Implemented
UF0380 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,780 $2,688 Implemented
UF0380 # 07 Y:2006 07 2006 ELIMINATE A BY-PRODUCT $703 $160 Implemented
GT0822 # 07 Y:2006 07 2006 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $450,000 $20,000 Implemented
GT0822 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $97,628 $18,865 Implemented
GT0822 # 01 Y:2006 01 2006 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $22,995 $640 Implemented