Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
59
matching recommendationsNAICS | 32531 | Fertilizer Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0584 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,871 | $0 | n/a |
LE0584 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,377 | $2,400 | n/a |
LE0584 # 05 Y:2025 | 05 | 2025 | INSTALL BACK-UP EQUIPMENT | $148,846 | $350,000 | n/a |
LE0584 # 07 Y:2025 | 07 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,000 | $31,500 | n/a |
LE0584 # 08 Y:2025 | 08 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $8,045 | $30,000 | n/a |
LE0584 # 06 Y:2025 | 06 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,853 | $5,000 | n/a |
LE0584 # 03 Y:2025 | 03 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $1,504 | $600 | n/a |
LE0584 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,030 | $100 | n/a |
UF0618 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $19,157 | $112,913 | n/a |
UF0618 # 07 Y:2024 | 07 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $10,000 | $1,931 | n/a |
UF0618 # 06 Y:2024 | 06 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,621 | $12,380 | n/a |
UF0618 # 05 Y:2024 | 05 | 2024 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $150,000 | $70,000 | n/a |
UF0618 # 04 Y:2024 | 04 | 2024 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $308,175 | $14,388 | n/a |
UF0618 # 03 Y:2024 | 03 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,409 | $5,855 | n/a |
UF0618 # 02 Y:2024 | 02 | 2024 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $1,789 | $872 | n/a |
UU0252 # 01 Y:2024 | 01 | 2024 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $19,754 | $108,000 | n/a |
UU0252 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,880 | $5,500 | n/a |
UU0252 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,070 | $4,410 | n/a |
UU0252 # 02 Y:2024 | 02 | 2024 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $53,389 | $212,000 | n/a |
NL0072 # 03 Y:2022 | 03 | 2022 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $2,055 | $266 | Implemented |
NL0072 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,761 | $20,400 | Implemented |
NL0072 # 01 Y:2022 | 01 | 2022 | REPLACE BOILER | $18,966 | $23,925 | Implemented |
NL0072 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $773 | $1,445 | Not Implemented |
AM0703 # 05 Y:2016 | 05 | 2016 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $3,830 | $1,000 | Implemented |
AM0703 # 06 Y:2016 | 06 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,500 | $195 | Implemented |