IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 3254 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0654 # 05 Y:2020 05 2020 RECOVER WASTE HEAT FROM EQUIPMENT $44,735 $130,000 Not Implemented
NC0654 # 04 Y:2020 04 2020 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,543 $6,700 Not Implemented
NC0654 # 03 Y:2020 03 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,303 $20,000 Not Implemented
NC0654 # 02 Y:2020 02 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,030 $75,000 Not Implemented
NC0654 # 01 Y:2020 01 2020 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $1,381,024 $8,000,000 Not Implemented
CL1909 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,417 $15,294 Not Implemented
CL1909 # 02 Y:2019 02 2019 REPAIR AND ELIMINATE STEAM LEAKS $3,542 $2,040 Implemented
CL1909 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $647 $2,080 Implemented
CL1909 # 04 Y:2019 04 2019 PAY BILLS ON TIME TO AVOID LATE FEES $2,971 $0 Implemented
CL1909 # 05 Y:2019 05 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $143,304 $600 Not Implemented
CL1903 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $74,869 $246,400 Not Implemented
CL1903 # 03 Y:2019 03 2019 USE POWER DURING OFF-PEAK PERIODS $14,816 $1,000 Not Implemented
CL1903 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,099 $450 Not Implemented
NC0557 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,783 $3,000 Not Implemented
NC0557 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,813 $93 Not Implemented
NC0557 # 06 Y:2015 06 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,206 $38 Not Implemented
NC0557 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $139 $640 Not Implemented
NC0557 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $251 $1,040 Not Implemented
NC0557 # 03 Y:2015 03 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,307 $200 Not Implemented
NC0557 # 02 Y:2015 02 2015 REPAIR AND ELIMINATE STEAM LEAKS $4,345 $1,000 Not Implemented
NC0557 # 01 Y:2015 01 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $40,351 $30,000 Not Implemented