Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
411
matching recommendationsNAICS | 32541 | Pharmaceutical and Medicine Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0283 # 03 Y:2004 | 03 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,469 | $1,200 | Implemented |
NC0283 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $1,077 | $356 | Implemented |
WI0459 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $340 | $640 | Implemented |
MS0224 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,243 | $26,302 | Implemented |
MS0224 # 10 Y:2003 | 10 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,641 | $181 | Implemented |
MS0224 # 11 Y:2003 | 11 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,861 | $7,596 | Implemented |
MI0058 # 02 Y:2003 | 02 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $1,906 | $696 | Implemented |
MI0058 # 05 Y:2003 | 05 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $250,000 | $43,000 | Implemented |
MI0058 # 06 Y:2003 | 06 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $13,520 | $400,000 | Implemented |
MI0057 # 03 Y:2003 | 03 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $3,177 | $1,160 | Implemented |
MI0057 # 06 Y:2003 | 06 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,443 | $400,000 | Implemented |
MI0057 # 08 Y:2003 | 08 | 2003 | METER WASTE WATER | $12,786 | $1,950 | Implemented |
MI0056 # 02 Y:2003 | 02 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $281,112 | $88,736 | Implemented |
MI0056 # 05 Y:2003 | 05 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $7,955 | $904 | Implemented |
MI0056 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,054 | $40,600 | Implemented |
MI0056 # 07 Y:2003 | 07 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $500,000 | $43,000 | Implemented |
MI0056 # 08 Y:2003 | 08 | 2003 | METER WASTE WATER | $25,572 | $1,950 | Implemented |
CO0521 # 03 Y:2003 | 03 | 2003 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,010 | $1,400 | Implemented |
CO0521 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,000 | $200 | Implemented |
MA0528 # 04 Y:2003 | 04 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,752 | $0 | Implemented |
MA0528 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $2,103 | $1,325 | Implemented |
AM0431 # 01 Y:2003 | 01 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $23,400 | $240 | Implemented |
AM0431 # 03 Y:2003 | 03 | 2003 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $3,480 | $5,640 | Implemented |
AM0431 # 04 Y:2003 | 04 | 2003 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,100 | $0 | Implemented |
AM0431 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,460 | $1,790 | Implemented |