IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

411

matching recommendations
Reset
NAICS 32541 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0283 # 03 Y:2004 03 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,469 $1,200 Implemented
NC0283 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $1,077 $356 Implemented
WI0459 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $340 $640 Implemented
MS0224 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,243 $26,302 Implemented
MS0224 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,641 $181 Implemented
MS0224 # 11 Y:2003 11 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,861 $7,596 Implemented
MI0058 # 02 Y:2003 02 2003 REPAIR OR REPLACE STEAM TRAPS $1,906 $696 Implemented
MI0058 # 05 Y:2003 05 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $250,000 $43,000 Implemented
MI0058 # 06 Y:2003 06 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,520 $400,000 Implemented
MI0057 # 03 Y:2003 03 2003 REPAIR OR REPLACE STEAM TRAPS $3,177 $1,160 Implemented
MI0057 # 06 Y:2003 06 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,443 $400,000 Implemented
MI0057 # 08 Y:2003 08 2003 METER WASTE WATER $12,786 $1,950 Implemented
MI0056 # 02 Y:2003 02 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $281,112 $88,736 Implemented
MI0056 # 05 Y:2003 05 2003 REPAIR OR REPLACE STEAM TRAPS $7,955 $904 Implemented
MI0056 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,054 $40,600 Implemented
MI0056 # 07 Y:2003 07 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $500,000 $43,000 Implemented
MI0056 # 08 Y:2003 08 2003 METER WASTE WATER $25,572 $1,950 Implemented
CO0521 # 03 Y:2003 03 2003 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,010 $1,400 Implemented
CO0521 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $200 Implemented
MA0528 # 04 Y:2003 04 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,752 $0 Implemented
MA0528 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $2,103 $1,325 Implemented
AM0431 # 01 Y:2003 01 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $23,400 $240 Implemented
AM0431 # 03 Y:2003 03 2003 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,480 $5,640 Implemented
AM0431 # 04 Y:2003 04 2003 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,100 $0 Implemented
AM0431 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,460 $1,790 Implemented