Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsNAICS | 32541 | Pharmaceutical and Medicine Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0572 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,372 | $0 | Implemented |
SD0572 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $349 | $378 | Implemented |
SD0572 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $970 | $1,350 | Implemented |
SD0572 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,304 | $22,430 | Implemented |
SD0572 # 01 Y:2018 | 01 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $75,389 | $234,915 | Implemented |
SD0545 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $3,536 | $6,060 | Implemented |
SD0545 # 05 Y:2017 | 05 | 2017 | INSULATE BARE EQUIPMENT | $954 | $449 | Implemented |
SD0545 # 06 Y:2017 | 06 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $545 | $914 | Implemented |
SD0545 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,279 | $33,276 | Implemented |
SD0500 # 01 Y:2015 | 01 | 2015 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $326,647 | $943,500 | Implemented |
SD0500 # 02 Y:2015 | 02 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $105,336 | $417,200 | Implemented |
SD0500 # 06 Y:2015 | 06 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,651 | $500 | Implemented |
SD0500 # 07 Y:2015 | 07 | 2015 | USE PHOTOCELL CONTROLS | $1,308 | $2,775 | Implemented |
SF0378 # 02 Y:2009 | 02 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,697 | $0 | Implemented |
SF0378 # 03 Y:2009 | 03 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,063 | $500 | Implemented |
SD0413 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,118 | $9,600 | Implemented |
SD0413 # 02 Y:2009 | 02 | 2009 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $57,036 | $120,000 | Implemented |
SD0413 # 04 Y:2009 | 04 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,991 | $20,850 | Implemented |
SD0413 # 03 Y:2009 | 03 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $31,920 | $13,200 | Implemented |
SD0413 # 06 Y:2009 | 06 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,623 | $13,300 | Implemented |
SD0413 # 08 Y:2009 | 08 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,905 | $13,511 | Implemented |
SD0413 # 07 Y:2009 | 07 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $16,800 | $2,000 | Implemented |
SF0340 # 16 Y:2007 | 16 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,354 | $70,400 | Implemented |
SF0340 # 04 Y:2007 | 04 | 2007 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $155,963 | $36,556 | Implemented |
SF0340 # 08 Y:2007 | 08 | 2007 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $4,828 | $1,892 | Implemented |