Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 32541 | Pharmaceutical and Medicine Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0011 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,227 | $680 | n/a |
CC0011 # 03 Y:2022 | 03 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,203 | $5,000 | n/a |
CC0011 # 04 Y:2022 | 04 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,746 | $1,700 | n/a |
CC0011 # 05 Y:2022 | 05 | 2022 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $10,252 | $50,000 | n/a |
CC0011 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $754 | $0 | n/a |
NC0654 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $44,735 | $130,000 | Not Implemented |
NC0654 # 04 Y:2020 | 04 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,543 | $6,700 | Not Implemented |
NC0654 # 03 Y:2020 | 03 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,303 | $20,000 | Not Implemented |
NC0654 # 02 Y:2020 | 02 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,030 | $75,000 | Not Implemented |
NC0654 # 01 Y:2020 | 01 | 2020 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,381,024 | $8,000,000 | Not Implemented |
CL1909 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $647 | $2,080 | Implemented |
CL1909 # 04 Y:2019 | 04 | 2019 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,971 | $0 | Implemented |
CL1909 # 05 Y:2019 | 05 | 2019 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $143,304 | $600 | Not Implemented |
CL1909 # 02 Y:2019 | 02 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $3,542 | $2,040 | Implemented |
CL1909 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,417 | $15,294 | Not Implemented |
CL1903 # 03 Y:2019 | 03 | 2019 | USE POWER DURING OFF-PEAK PERIODS | $14,816 | $1,000 | Not Implemented |
CL1903 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $74,869 | $246,400 | Not Implemented |
CL1903 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,099 | $450 | Not Implemented |
NC0557 # 01 Y:2015 | 01 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $40,351 | $30,000 | Not Implemented |
NC0557 # 02 Y:2015 | 02 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $4,345 | $1,000 | Not Implemented |
NC0557 # 03 Y:2015 | 03 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,307 | $200 | Not Implemented |
NC0557 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,783 | $3,000 | Not Implemented |
NC0557 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,813 | $93 | Not Implemented |
NC0557 # 06 Y:2015 | 06 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,206 | $38 | Not Implemented |
NC0557 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $139 | $640 | Not Implemented |