Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
769
matching recommendationsNAICS | 325412 | Pharmaceutical Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0395 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,603 | $2,100 | Not Implemented |
NL0061 # 07 Y:2022 | 07 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $967 | $1,650 | Not Implemented |
NL0061 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,556 | $2,500 | Implemented |
NL0061 # 05 Y:2022 | 05 | 2022 | RECOVER AND REUSE WASTE MATERIAL | $3,432 | $3,500 | Implemented |
NL0061 # 04 Y:2022 | 04 | 2022 | METER WASTE WATER | $3,714 | $580 | Not Implemented |
NL0061 # 03 Y:2022 | 03 | 2022 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,939 | $70 | Implemented |
NL0061 # 02 Y:2022 | 02 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $9,080 | $70 | Implemented |
NL0061 # 01 Y:2022 | 01 | 2022 | METER WASTE WATER | $9,914 | $580 | Not Implemented |
NL0061 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $595 | $1,289 | Implemented |
NC0654 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $44,735 | $130,000 | Not Implemented |
NC0654 # 04 Y:2020 | 04 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,543 | $6,700 | Not Implemented |
NC0654 # 03 Y:2020 | 03 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,303 | $20,000 | Not Implemented |
NC0654 # 02 Y:2020 | 02 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,030 | $75,000 | Not Implemented |
NC0654 # 01 Y:2020 | 01 | 2020 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,381,024 | $8,000,000 | Not Implemented |
UD1024 # 01 Y:2020 | 01 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $454 | $0 | Not Implemented |
UD1024 # 02 Y:2020 | 02 | 2020 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $44,273 | $40,000 | Not Implemented |
UD1024 # 03 Y:2020 | 03 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $37,324 | $1,300 | Not Implemented |
UD1024 # 04 Y:2020 | 04 | 2020 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $15,421 | $0 | Not Implemented |
UD1024 # 05 Y:2020 | 05 | 2020 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $921,416 | $672,400 | Not Implemented |
UD1024 # 06 Y:2020 | 06 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $52,582 | $24,500 | Not Implemented |
UD1024 # 07 Y:2020 | 07 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,282 | $28,000 | Not Implemented |
UD1024 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,759 | $10,650 | Implemented |
UD1024 # 09 Y:2020 | 09 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $40,609 | $80,500 | Not Implemented |
UD1024 # 10 Y:2020 | 10 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,326 | $30,000 | Not Implemented |
UD1024 # 11 Y:2020 | 11 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $636 | $0 | Implemented |