IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
NAICS 325414 Biological Product (except Diagnostic) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0629 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $974 $1,320 Not Implemented
SD0629 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,538 $10,551 Not Implemented
SD0629 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $64,030 $201,231 Not Implemented
SD0629 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,948 $100 Not Implemented
SD0629 # 04 Y:2023 04 2023 USE PHOTOCELL CONTROLS $888 $1,680 Not Implemented
SD0626 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,114 $4,352 Not Implemented
SD0626 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $54,888 $228,599 Not Implemented
SD0626 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,642 $5,868 Not Implemented
SD0626 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,022 $3,456 Not Implemented
SD0626 # 06 Y:2023 06 2023 MODIFY STARTUP/SHUTDOWN TIMES $87,191 $2,500 Not Implemented
SD0626 # 05 Y:2023 05 2023 MODIFY STARTUP/SHUTDOWN TIMES $90,974 $2,500 Not Implemented
SD0625 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $100,326 $408,646 Not Implemented
SD0625 # 05 Y:2023 05 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,482 $5,000 Not Implemented
SD0625 # 02 Y:2023 02 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $868 $4,212 Not Implemented
SD0625 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $348 $1,355 Not Implemented
SD0625 # 04 Y:2023 04 2023 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $8,765 $13,961 Not Implemented
SD0413 # 01 Y:2009 01 2009 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $151,192 $1,125,000 Not Implemented
SD0413 # 02 Y:2009 02 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $57,036 $120,000 Implemented
SD0413 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,118 $9,600 Implemented
SD0413 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,623 $13,300 Implemented
SD0413 # 07 Y:2009 07 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $16,800 $2,000 Implemented
SD0413 # 08 Y:2009 08 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,905 $13,511 Implemented
SD0413 # 09 Y:2009 09 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,825 $17,794 Not Implemented
SD0413 # 10 Y:2009 10 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,202 $0 Not Implemented
SD0413 # 11 Y:2009 11 2009 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,764 $1,725 Not Implemented