Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsNAICS | 325414 | Biological Product (except Diagnostic) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0521 # 06 Y:2003 | 06 | 2003 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $48,290 | $175,000 | Not Implemented |
CO0521 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,650 | $3,532 | Not Implemented |
CO0521 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,000 | $200 | Implemented |
CO0521 # 03 Y:2003 | 03 | 2003 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,010 | $1,400 | Implemented |
CO0521 # 02 Y:2003 | 02 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,840 | $5,100 | Not Implemented |
CO0521 # 01 Y:2003 | 01 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $65,190 | $82,000 | Not Implemented |
MA0528 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $2,103 | $1,325 | Implemented |
MA0528 # 04 Y:2003 | 04 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,752 | $0 | Implemented |
MA0528 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,167 | $9,862 | Not Implemented |
MA0528 # 02 Y:2003 | 02 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,180 | $16,000 | Not Implemented |
MA0528 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,973 | $48,190 | Not Implemented |
AM0431 # 02 Y:2003 | 02 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,030 | $11,900 | Not Implemented |
AM0431 # 10 Y:2003 | 10 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $780 | $1,520 | Not Implemented |
AM0431 # 01 Y:2003 | 01 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $23,400 | $240 | Implemented |
AM0431 # 03 Y:2003 | 03 | 2003 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $3,480 | $5,640 | Implemented |
AM0431 # 04 Y:2003 | 04 | 2003 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,100 | $0 | Implemented |
AM0431 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,460 | $1,790 | Implemented |
AM0431 # 06 Y:2003 | 06 | 2003 | REDUCE HEAT GAIN BY WINDOW TINTING | $1,720 | $4,460 | Not Implemented |
AM0431 # 11 Y:2003 | 11 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $760 | $0 | Implemented |
AM0431 # 09 Y:2003 | 09 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,130 | $0 | Implemented |
AM0431 # 08 Y:2003 | 08 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,150 | $0 | Implemented |
AM0431 # 07 Y:2003 | 07 | 2003 | PAY BILLS ON TIME TO AVOID LATE FEES | $750 | $0 | Implemented |
LM0046 # 10 Y:2003 | 10 | 2003 | RECOVER AND REUSE COOLING WATER | $40,647 | $5,000 | Implemented |
LM0046 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $232 | $20 | Not Implemented |
LM0046 # 13 Y:2003 | 13 | 2003 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $230,000 | $336,269 | Implemented |