Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
304
matching recommendationsNAICS | 3255 | Paint, Coating, and Adhesive Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0312 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,806 | $3,600 | Implemented |
MI0312 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $9,922 | $1,995 | Implemented |
MI0312 # 05 Y:2017 | 05 | 2017 | USE PHOTOCELL CONTROLS | $9,752 | $8,000 | Implemented |
MI0312 # 07 Y:2017 | 07 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,544 | $19,300 | Implemented |
MI0312 # 08 Y:2017 | 08 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,938 | $960 | Implemented |
UK1613 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,264 | $1,200 | Implemented |
UK1613 # 07 Y:2017 | 07 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $871 | $0 | Implemented |
UK1613 # 08 Y:2017 | 08 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $535 | $0 | Implemented |
UK1613 # 02 Y:2017 | 02 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,671 | $0 | Implemented |
UK1613 # 09 Y:2017 | 09 | 2017 | USE ONLY CERTIFIED MOTOR REPAIR SHOPS | $478 | $756 | Implemented |
UK1613 # 10 Y:2017 | 10 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $145 | $0 | Implemented |
IP0078 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $820 | $4 | Implemented |
IP0078 # 02 Y:2017 | 02 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,032 | $21 | Implemented |
IP0078 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $1,354 | $3,396 | Implemented |
MA0762 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,640 | $13,585 | Implemented |
MA0762 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,587 | $19,980 | Implemented |
MA0762 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $49,046 | $65,000 | Implemented |
MA0762 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,257 | $19,975 | Implemented |
MA0762 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $65,741 | $161,899 | Implemented |
WM0084 # 11 Y:2016 | 11 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,465 | $0 | Implemented |
WM0084 # 08 Y:2016 | 08 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,103 | $400 | Implemented |
WM0084 # 06 Y:2016 | 06 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,665 | $0 | Implemented |
WM0084 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,605 | $1,900 | Implemented |
WM0084 # 12 Y:2016 | 12 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $866 | $1,988 | Implemented |
WM0084 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,124 | $83,912 | Implemented |