Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
66
matching recommendationsNAICS | 32551 | Paint and Coating Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1089 # 06 Y:2024 | 06 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,228 | $27,650 | Not Implemented |
UD1089 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $472 | $550 | Not Implemented |
UD1089 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,169 | $2,030 | Not Implemented |
UD1089 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $79,860 | $0 | Not Implemented |
UD1089 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,974 | $0 | Implemented |
UD1089 # 02 Y:2024 | 02 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $30,384 | $0 | Not Implemented |
WV0579 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,976 | $11,825 | Not Implemented |
WV0579 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $18,379 | $3,500 | Implemented |
WV0579 # 03 Y:2019 | 03 | 2019 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $14,452 | $10,325 | Not Implemented |
WV0579 # 05 Y:2019 | 05 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $4,488 | $879 | Implemented |
WV0579 # 01 Y:2019 | 01 | 2019 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $95,486 | $76,000 | Not Implemented |
WV0579 # 08 Y:2019 | 08 | 2019 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $889 | $1,460 | Not Implemented |
WV0579 # 09 Y:2019 | 09 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $589 | $1,000 | Implemented |
WV0579 # 07 Y:2019 | 07 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $1,120 | $5,000 | Not Implemented |
WV0579 # 10 Y:2019 | 10 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $346 | $33 | Implemented |
WV0579 # 04 Y:2019 | 04 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,774 | $22,038 | Not Implemented |
UD0898 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,748 | $2,320 | Not Implemented |
UD0898 # 04 Y:2014 | 04 | 2014 | COVER OPEN TANKS | $57 | $200 | Implemented |
UD0898 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $309 | $0 | Implemented |
UD0898 # 05 Y:2014 | 05 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $8,127 | $6,567 | Not Implemented |
UD0898 # 01 Y:2014 | 01 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $156 | $50 | Implemented |
UD0898 # 03 Y:2014 | 03 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $778 | $0 | Not Implemented |
UD0898 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $621 | $20 | Implemented |
UD0898 # 02 Y:2014 | 02 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $11,196 | $300 | Not Implemented |
UD0886 # 10 Y:2013 | 10 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $575 | $1,000 | Not Implemented |