IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

399

matching recommendations
Reset
NAICS 325510 Paint and Coating Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0075 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $12,658 $3,832 Not Implemented
IC0075 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,066 $0 Not Implemented
IC0075 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,878 $6,154 Not Implemented
IC0075 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,105 $2,900 Implemented
AM0449 # 01 Y:2004 01 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $18,000 $4,600 Not Implemented
AM0449 # 02 Y:2004 02 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $12,000 $0 Not Implemented
AM0449 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,550 $0 Not Implemented
AM0449 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,050 $0 Not Implemented
AM0449 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,925 $2,280 Not Implemented
AM0449 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $1,613 $0 Not Implemented
SU0170 # 01 Y:2003 01 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,400 $0 Not Implemented
SU0170 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,210 $0 Not Implemented
SU0170 # 03 Y:2003 03 2003 ADVERTISE PRODUCT OR SERVICE $31,250 $1,000 Implemented
SU0170 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,181 $47 Implemented
SU0170 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $466 $57 Implemented
SU0170 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,229 $185 Implemented
SU0170 # 07 Y:2003 07 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,666 $16,761 Not Implemented
SU0170 # 08 Y:2003 08 2003 REPLACE BOILER $10,809 $33,514 Not Implemented
IC0069 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,411 $2,200 Implemented
IC0069 # 02 Y:2003 02 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $4,983 $8,812 Implemented
IC0069 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,894 $5,280 Implemented
IC0069 # 04 Y:2003 04 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $10,894 $10,560 Implemented
IC0069 # 05 Y:2003 05 2003 REPAIR OR REPLACE STEAM TRAPS $6,176 $341 Implemented
IC0069 # 06 Y:2003 06 2003 REDESIGN PROCESS $579 $1,984 Not Implemented
IC0069 # 07 Y:2003 07 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,246 $26,552 Not Implemented