Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
66
matching recommendationsNAICS | 325510 | Paint and Coating Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1089 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $79,860 | $0 | n/a |
UD1089 # 02 Y:2024 | 02 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $30,384 | $0 | n/a |
UD1089 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,974 | $0 | n/a |
UD1089 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,169 | $2,030 | n/a |
UD1089 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $472 | $550 | n/a |
UD1089 # 06 Y:2024 | 06 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,228 | $27,650 | n/a |
WV0579 # 10 Y:2019 | 10 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $346 | $33 | Implemented |
WV0579 # 01 Y:2019 | 01 | 2019 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $95,486 | $76,000 | Not Implemented |
WV0579 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $18,379 | $3,500 | Implemented |
WV0579 # 03 Y:2019 | 03 | 2019 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $14,452 | $10,325 | Not Implemented |
WV0579 # 04 Y:2019 | 04 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,774 | $22,038 | Not Implemented |
WV0579 # 05 Y:2019 | 05 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $4,488 | $879 | Implemented |
WV0579 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,976 | $11,825 | Not Implemented |
WV0579 # 07 Y:2019 | 07 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $1,120 | $5,000 | Not Implemented |
WV0579 # 08 Y:2019 | 08 | 2019 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $889 | $1,460 | Not Implemented |
WV0579 # 09 Y:2019 | 09 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $589 | $1,000 | Implemented |
UD0898 # 03 Y:2014 | 03 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $778 | $0 | Not Implemented |
UD0898 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $309 | $0 | Implemented |
UD0898 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $621 | $20 | Implemented |
UD0898 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,748 | $2,320 | Not Implemented |
UD0898 # 05 Y:2014 | 05 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $8,127 | $6,567 | Not Implemented |
UD0898 # 04 Y:2014 | 04 | 2014 | COVER OPEN TANKS | $57 | $200 | Implemented |
UD0898 # 02 Y:2014 | 02 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $11,196 | $300 | Not Implemented |
UD0898 # 01 Y:2014 | 01 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $156 | $50 | Implemented |
UD0886 # 07 Y:2013 | 07 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $36,728 | $14,900 | Implemented |