IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 32552 Adhesive Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0748 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,020 $345 Implemented
AM0748 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,640 $0 Implemented
AM0748 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,425 $1,000 Implemented
AM0748 # 03 Y:2018 03 2018 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $13,900 $18,200 Implemented
AM0748 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,300 $51,700 Implemented
AM0748 # 07 Y:2018 07 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,160 $145 Implemented
AM0591 # 05 Y:2011 05 2011 REPAIR OR REPLACE STEAM TRAPS $5,270 $1,300 Implemented
AM0591 # 12 Y:2011 12 2011 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $310 $170 Implemented
AM0591 # 09 Y:2011 09 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,800 $325 Implemented
AM0591 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $2,200 $950 Implemented
AM0591 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,275 $4,290 Implemented
AM0591 # 04 Y:2011 04 2011 REPAIR AND ELIMINATE STEAM LEAKS $9,540 $5,000 Implemented
AM0591 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $10,060 $15,900 Implemented
TA0062 # 07 Y:2003 07 2003 REPAIR AND ELIMINATE STEAM LEAKS $390 $100 Implemented
TA0062 # 01 Y:2003 01 2003 COMBINE UTILITY METERS $44,572 $57,200 Implemented
TA0062 # 02 Y:2003 02 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $26,157 $0 Implemented
TA0062 # 03 Y:2003 03 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $7,420 $13,085 Implemented
TA0062 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,035 $1,936 Implemented
TA0062 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $780 $144 Implemented
TA0062 # 08 Y:2003 08 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $140 $0 Implemented
AM0432 # 09 Y:2003 09 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $220 $50 Implemented
AM0432 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,380 $500 Implemented
AM0432 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,680 $4,300 Implemented
AM0432 # 03 Y:2003 03 2003 REPAIR OR REPLACE STEAM TRAPS $9,300 $940 Implemented
AM0432 # 02 Y:2003 02 2003 REPAIR AND ELIMINATE STEAM LEAKS $12,670 $560 Implemented