IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 325612 Polish and Other Sanitation Good Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1046 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,027 $38,688 Implemented
OK1046 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $827 $0 Implemented
MI0344 # 08 Y:2018 08 2018 INSTALL OCCUPANCY SENSORS $1,536 $846 Implemented
MI0344 # 09 Y:2018 09 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $474 $760 Implemented
MI0344 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,495 $2,030 Implemented
MI0344 # 06 Y:2018 06 2018 USE PHOTOCELL CONTROLS $3,042 $2,219 Implemented
MI0344 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,313 $15,147 Implemented
MI0344 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,405 $6,666 Implemented
MZ0228 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $897 $340 Implemented
MZ0228 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,423 $280 Implemented
MZ0228 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,092 $1,772 Implemented
MZ0228 # 02 Y:2017 02 2017 RECOVER WASTE HEAT FROM EQUIPMENT $7,002 $1,080 Implemented
MZ0228 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN WATER LINES AND VALVES $20,062 $0 Implemented
DL0164 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,513 $59,950 Implemented
AM0678 # 02 Y:2015 02 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,100 $690 Implemented
AM0678 # 03 Y:2015 03 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,300 $0 Implemented
AM0678 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $365 $200 Implemented
AM0678 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,360 $1,300 Implemented
UD0760 # 04 Y:2007 04 2007 DEVELOP A REPAIR/REPLACE POLICY $3,677 $13,959 Implemented
UD0760 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $4,030 $2,760 Implemented
UD0760 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $563 $48 Implemented
UD0760 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,886 $6,000 Implemented
UD0760 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,006 $1,250 Implemented
UD0760 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,480 $0 Implemented
UD0760 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $10,167 $6 Implemented