IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
Reset
NAICS 32562 Toilet Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0204 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $4,922 $20,000 Implemented
TT0204 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,716 $10,000 Implemented
TT0204 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $94,373 $226,854 Implemented
SD0533 # 07 Y:2016 07 2016 USE PHOTOCELL CONTROLS $2,169 $3,700 Implemented
SD0533 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,056 $1,000 Implemented
SD0533 # 03 Y:2016 03 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,672 $7,800 Implemented
SD0533 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,187 $25,315 Implemented
UK1603 # 10 Y:2016 10 2016 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,457 $0 Implemented
UK1603 # 09 Y:2016 09 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $33,165 $58,682 Implemented
UK1603 # 07 Y:2016 07 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,948 $0 Implemented
UK1603 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,304 $1,600 Implemented
UK1603 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,160 $14,700 Implemented
UK1603 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,272 $35,000 Implemented
UK1603 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $89,730 $85,358 Implemented
AM0656 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,540 $15,500 Implemented
AM0656 # 01 Y:2014 01 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $103,415 $0 Implemented
MZ0127 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $13,741 $16,000 Implemented
MZ0127 # 01 Y:2013 01 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $0 $0 Implemented
MZ0127 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,446 $1,300 Implemented
MZ0127 # 06 Y:2013 06 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,597 $8,000 Implemented
MZ0127 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,278 $4,500 Implemented
MZ0127 # 10 Y:2013 10 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,000 $0 Implemented
MZ0127 # 12 Y:2013 12 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $38,737 $28,800 Implemented
MZ0127 # 11 Y:2013 11 2013 REPAIR OR REPLACE STEAM TRAPS $12,000 $0 Implemented
BS0015 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $211 $979 Implemented