Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
98
matching recommendationsNAICS | 32562 | Toilet Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0127 # 12 Y:2013 | 12 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $38,737 | $28,800 | Implemented |
BS0015 # 04 Y:2013 | 04 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $211 | $979 | Implemented |
BS0015 # 05 Y:2013 | 05 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $607 | $990 | Implemented |
BS0015 # 08 Y:2013 | 08 | 2013 | MINIMIZE WATER USAGE | $151 | $59 | Implemented |
MI0234 # 01 Y:2013 | 01 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,035 | $2,600 | Implemented |
MI0234 # 02 Y:2013 | 02 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,388 | $80 | Implemented |
MI0234 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,377 | $1,660 | Implemented |
MI0234 # 04 Y:2013 | 04 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,115 | $8,409 | Implemented |
MI0234 # 08 Y:2013 | 08 | 2013 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $252 | $447 | Implemented |
MI0234 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,103 | $80 | Implemented |
MI0234 # 05 Y:2013 | 05 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,067 | $2,520 | Implemented |
NC0464 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,873 | $35,445 | Implemented |
NC0464 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $79 | $110 | Implemented |
NC0464 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $87,056 | $77,718 | Implemented |
LL0296 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,916 | $1,750 | Implemented |
LL0296 # 04 Y:2008 | 04 | 2008 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $12,169 | $2,120 | Implemented |
LL0296 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $116,005 | $24,680 | Implemented |
UF0370 # 11 Y:2005 | 11 | 2005 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,313 | $0 | Implemented |
UF0370 # 09 Y:2005 | 09 | 2005 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $47,299 | $130,000 | Implemented |
UF0370 # 07 Y:2005 | 07 | 2005 | INSULATE BARE EQUIPMENT | $4,053 | $1,317 | Implemented |
UF0370 # 03 Y:2005 | 03 | 2005 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $20,435 | $56,000 | Implemented |
UF0370 # 01 Y:2005 | 01 | 2005 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,736 | $1,212 | Implemented |
UU0049 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,222 | $14,385 | Implemented |