IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

361

matching recommendations
Reset
NAICS 32599 All Other Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0341 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,073 $1,800 Implemented
WV0341 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $2,679 $543 Implemented
WV0341 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,388 $625 Implemented
WV0341 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,253 $1,270 Implemented
WV0341 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $850 $0 Implemented
WV0341 # 11 Y:2006 11 2006 DEVELOP A REPAIR/REPLACE POLICY $501 $213 Implemented
OK0727 # 01 Y:2006 01 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,431 $2,462 Implemented
OK0727 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,646 $75 Implemented
OK0727 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $14,689 $7,635 Implemented
AS0415 # 01 Y:2006 01 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $19,739 $5,500 Implemented
AS0415 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,372 $1,000 Implemented
LE0217 # 02 Y:2005 02 2005 KEEP EQUIPMENT CLEAN $28,000 $840 Implemented
LE0217 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $16,487 $6,845 Implemented
LE0217 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,764 $900 Implemented
LE0217 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,158 $900 Implemented
LE0217 # 08 Y:2005 08 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,372 $263 Implemented
LM0099 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,622 $650 Implemented
LM0099 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,318 $3,000 Implemented
LM0099 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $636 $0 Implemented
LM0099 # 04 Y:2005 04 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $565 $0 Implemented
TA0088 # 01 Y:2004 01 2004 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $146,590 $20,000 Implemented
TA0088 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $66,520 $1,010 Implemented
TA0088 # 05 Y:2004 05 2004 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $15,810 $2,000 Implemented
TA0088 # 06 Y:2004 06 2004 REDUCE OR ELIMINATE WASTE $18,000 $1,000 Implemented
TA0088 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,995 $1,000 Implemented