Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsNAICS | 32599 | All Other Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0297 # 13 Y:2024 | 13 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $4,854 | $360 | Implemented |
IC0297 # 12 Y:2024 | 12 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,395 | $609 | Implemented |
IC0297 # 15 Y:2024 | 15 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,222 | $0 | Implemented |
IC0297 # 10 Y:2024 | 10 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,801 | $0 | Implemented |
IC0297 # 08 Y:2024 | 08 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,754 | $36,000 | Implemented |
IC0297 # 14 Y:2024 | 14 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $119 | $0 | Implemented |
IC0297 # 05 Y:2024 | 05 | 2024 | USE OPTIMUM THICKNESS INSULATION | $2,433 | $1,693 | Implemented |
IC0297 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $26,122 | $13,370 | Implemented |
IC0297 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $2,641 | $1,066 | Implemented |
IC0297 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $5,801 | $2,620 | Implemented |
IC0297 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,288 | $1,336 | Implemented |
IP0119 # 06 Y:2019 | 06 | 2019 | REPLACE BOILER | $20,712 | $66,681 | Implemented |
IP0119 # 05 Y:2019 | 05 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $27,937 | $38,052 | Implemented |
IP0119 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,002 | $875 | Implemented |
UD0753 # 11 Y:2007 | 11 | 2007 | USE OPTIMUM TEMPERATURE | $998 | $0 | Implemented |
UD0753 # 09 Y:2007 | 09 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,816 | $0 | Implemented |
UD0753 # 07 Y:2007 | 07 | 2007 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $8,390 | $15,000 | Implemented |
UD0753 # 06 Y:2007 | 06 | 2007 | USE RADIANT HEATER FOR SPOT HEATING | $10,800 | $15,600 | Implemented |
UD0753 # 05 Y:2007 | 05 | 2007 | INSULATE BARE EQUIPMENT | $11,994 | $7,875 | Implemented |
UD0753 # 02 Y:2007 | 02 | 2007 | REDUCE VENTILATION AIR | $67,600 | $19,800 | Implemented |
UD0753 # 01 Y:2007 | 01 | 2007 | DEVELOP STANDARD OPERATING PROCEDURES | $98,450 | $3,040 | Implemented |
BD0246 # 01 Y:2003 | 01 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $24,786 | $15,000 | Implemented |
BD0246 # 10 Y:2003 | 10 | 2003 | INSULATE BARE EQUIPMENT | $3,886 | $290 | Implemented |
BD0246 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,552 | $0 | Implemented |
BD0246 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,890 | $200 | Implemented |