Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
865
matching recommendationsNAICS | 32599 | All Other Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0727 # 03 Y:2006 | 03 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,463 | $40,452 | Not Implemented |
OK0727 # 04 Y:2006 | 04 | 2006 | USE GRAVITY FEEDS WHEREVER POSSIBLE | $10,056 | $1,636 | Not Implemented |
OK0727 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,960 | $8,407 | Not Implemented |
OK0727 # 06 Y:2006 | 06 | 2006 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $117,767 | $838,833 | Not Implemented |
OK0727 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $14,689 | $7,635 | Implemented |
OK0727 # 08 Y:2006 | 08 | 2006 | INSTALL OCCUPANCY SENSORS | $676 | $535 | Not Implemented |
WV0341 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $7,713 | $2,370 | Implemented |
WV0341 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,073 | $1,800 | Implemented |
WV0341 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $2,679 | $543 | Implemented |
WV0341 # 04 Y:2006 | 04 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $2,635 | $2,695 | Not Implemented |
WV0341 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,388 | $625 | Implemented |
WV0341 # 06 Y:2006 | 06 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,532 | $600 | Not Implemented |
WV0341 # 07 Y:2006 | 07 | 2006 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,368 | $2,700 | Not Implemented |
WV0341 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,253 | $1,270 | Implemented |
WV0341 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $850 | $0 | Implemented |
WV0341 # 10 Y:2006 | 10 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $571 | $525 | Not Implemented |
WV0341 # 11 Y:2006 | 11 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $501 | $213 | Implemented |
WV0341 # 12 Y:2006 | 12 | 2006 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $498 | $25 | Not Implemented |
AS0415 # 01 Y:2006 | 01 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $19,739 | $5,500 | Implemented |
AS0415 # 02 Y:2006 | 02 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,463 | $24,000 | Not Implemented |
AS0415 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,372 | $1,000 | Implemented |
AS0415 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $928 | $3,000 | Not Implemented |
AS0415 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $810 | $12,174 | Not Implemented |
AS0415 # 06 Y:2006 | 06 | 2006 | USE SOLAR HEAT TO HEAT WATER | $132 | $2,800 | Not Implemented |
LE0217 # 01 Y:2005 | 01 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $33,752 | $27,000 | Not Implemented |