IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

596

matching recommendations
Reset
NAICS 325998 All Other Miscellaneous Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0415 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,372 $1,000 Implemented
AS0415 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $928 $3,000 Not Implemented
AS0415 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $810 $12,174 Not Implemented
AS0415 # 06 Y:2006 06 2006 USE SOLAR HEAT TO HEAT WATER $132 $2,800 Not Implemented
TA0088 # 01 Y:2004 01 2004 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $146,590 $20,000 Implemented
TA0088 # 02 Y:2004 02 2004 USE OPTIMUM THICKNESS INSULATION $86,400 $1,610 Not Implemented
TA0088 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $66,520 $1,010 Implemented
TA0088 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $20,580 $15,340 Not Implemented
TA0088 # 05 Y:2004 05 2004 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $15,810 $2,000 Implemented
TA0088 # 06 Y:2004 06 2004 REDUCE OR ELIMINATE WASTE $18,000 $1,000 Implemented
TA0088 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,995 $1,000 Implemented
TA0088 # 08 Y:2004 08 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,000 $0 Not Implemented
UM0261 # 01 Y:2004 01 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $96,676 $11,096 Not Implemented
UM0261 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,377 $47,700 Not Implemented
UM0261 # 03 Y:2004 03 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $7,493 $2,000 Implemented
UM0261 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $6,503 $500 Implemented
UM0261 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,770 $1,711 Implemented
UM0261 # 06 Y:2004 06 2004 COVER OPEN TANKS $625 $300 Implemented
LL0159 # 01 Y:2003 01 2003 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $336,249 $481,633 Not Implemented
LL0159 # 02 Y:2003 02 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $217,796 $12,400 Implemented
LL0159 # 03 Y:2003 03 2003 USE PHOTOCELL CONTROLS $19,066 $924 Implemented
LL0159 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,635 $20 Implemented
LL0159 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $4,821 $1,204 Not Implemented
LL0159 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $4,389 $642 Implemented
LL0159 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $940 $525 Not Implemented