Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,572
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0351 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,336 | $0 | Implemented |
SF0351 # 12 Y:2008 | 12 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,836 | $93,064 | Implemented |
TT0015 # 03 Y:2007 | 03 | 2007 | REPAIR OR REPLACE STEAM TRAPS | $2,000 | $1,600 | Implemented |
MI0159 # 01 Y:2008 | 01 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,617 | $120 | Implemented |
MI0159 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,137 | $1,210 | Implemented |
MI0159 # 03 Y:2008 | 03 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,615 | $3,475 | Implemented |
MI0159 # 04 Y:2008 | 04 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,266 | $3,978 | Implemented |
MI0159 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,337 | $40 | Implemented |
MI0159 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,238 | $280 | Implemented |
MI0159 # 08 Y:2008 | 08 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,521 | $480 | Implemented |
AM0536 # 01 Y:2008 | 01 | 2008 | INSULATE BARE EQUIPMENT | $26,800 | $4,160 | Implemented |
AM0536 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,000 | $230 | Implemented |
AM0536 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,960 | $822 | Implemented |
MI0158 # 01 Y:2007 | 01 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $92,023 | $8,580 | Implemented |
MI0158 # 02 Y:2007 | 02 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $55,437 | $101,347 | Implemented |
MI0158 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,963 | $20,900 | Implemented |
MI0158 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,507 | $1,210 | Implemented |
MI0158 # 06 Y:2007 | 06 | 2007 | REPAIR OR REPLACE STEAM TRAPS | $13,330 | $1,700 | Implemented |
MI0158 # 09 Y:2007 | 09 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,073 | $40 | Implemented |
MI0158 # 10 Y:2007 | 10 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,886 | $2,000 | Implemented |
SF0350 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,920 | $300 | Implemented |
SF0350 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,274 | $1,332 | Implemented |
SF0350 # 03 Y:2007 | 03 | 2007 | INSTALL OCCUPANCY SENSORS | $399 | $492 | Implemented |
OK0753 # 01 Y:2007 | 01 | 2007 | OPTIMIZE PLANT POWER FACTOR | $49,649 | $0 | Implemented |
MS0322 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,977 | $662 | Implemented |