Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
134
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0108 # 07 Y:2013 | 07 | 2013 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $543 | $0 | Implemented |
LE0350 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,490 | $1,000 | Implemented |
LE0350 # 09 Y:2012 | 09 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $634 | $0 | Implemented |
LE0350 # 10 Y:2012 | 10 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $21 | $0 | Implemented |
LE0350 # 11 Y:2012 | 11 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $5,076 | $1,275 | Implemented |
LE0350 # 12 Y:2012 | 12 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,008 | $2,000 | Implemented |
LE0350 # 14 Y:2012 | 14 | 2012 | LOWER OPERATING PRESSURE OF CONDENSER (STEAM) | $57 | $0 | Implemented |
WV0426 # 01 Y:2011 | 01 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,820 | $1,000 | Implemented |
WV0426 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,303 | $29,900 | Implemented |
WV0426 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,594 | $458 | Implemented |
WV0426 # 08 Y:2011 | 08 | 2011 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,197 | $0 | Implemented |
WV0426 # 10 Y:2011 | 10 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $723 | $21 | Implemented |
LE0317 # 01 Y:2011 | 01 | 2011 | REPLACE BOILER | $284,580 | $500,000 | Implemented |
LE0317 # 02 Y:2011 | 02 | 2011 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $185,253 | $118,000 | Implemented |
LE0317 # 03 Y:2011 | 03 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,617 | $13,469 | Implemented |
LE0317 # 06 Y:2011 | 06 | 2011 | REPAIR OR REPLACE STEAM TRAPS | $23,321 | $4,200 | Implemented |
LE0317 # 07 Y:2011 | 07 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,721 | $22,000 | Implemented |
LE0317 # 08 Y:2011 | 08 | 2011 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,375 | $100,000 | Implemented |
LE0317 # 09 Y:2011 | 09 | 2011 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $8,387 | $8,000 | Implemented |
LE0317 # 10 Y:2011 | 10 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,358 | $870 | Implemented |
LE0317 # 11 Y:2011 | 11 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,938 | $3,000 | Implemented |
LE0317 # 13 Y:2011 | 13 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,553 | $2,440 | Implemented |
LE0317 # 15 Y:2011 | 15 | 2011 | INSTALL OCCUPANCY SENSORS | $1,097 | $2,035 | Implemented |
LE0317 # 16 Y:2011 | 16 | 2011 | INSTALL OCCUPANCY SENSORS | $153 | $1,000 | Implemented |
LE0308 # 01 Y:2010 | 01 | 2010 | INSTALL TIMERS AND/OR THERMOSTATS | $21,676 | $250 | Implemented |