IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,572

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0465 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,174 $3,762 Implemented
WV0465 # 08 Y:2013 08 2013 INSULATE BARE EQUIPMENT $1,171 $816 Implemented
WV0465 # 09 Y:2013 09 2013 DEVELOP A REPAIR/REPLACE POLICY $174 $415 Implemented
WV0465 # 10 Y:2013 10 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $155 $90 Implemented
UD0875 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,013 $0 Implemented
MZ0103 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $995 $27 Implemented
MZ0103 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $429 $160 Implemented
MZ0103 # 10 Y:2013 10 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $415 $156 Implemented
DL0100 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,567 $100 Implemented
DL0100 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,275 $0 Implemented
DL0100 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,698 $3,500 Implemented
DL0100 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,455 $20,000 Implemented
DL0100 # 07 Y:2013 07 2013 TREAT AND REUSE RINSE WATERS $7,121 $10,000 Implemented
OK0841 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $693 $4,051 Implemented
OK0841 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,217 $4,000 Implemented
OK0841 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,111 $1,134 Implemented
OK0841 # 13 Y:2013 13 2013 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $3,085 $14,817 Implemented
SF0425 # 01 Y:2013 01 2013 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $6,713 $0 Implemented
SF0425 # 02 Y:2013 02 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,421 $7,471 Implemented
SF0425 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,808 $7,235 Implemented
SF0425 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $3,416 $13,849 Implemented
SF0425 # 08 Y:2013 08 2013 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE $692 $2,830 Implemented
IA0492 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,544 $585 Implemented
IA0492 # 02 Y:2013 02 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,344 $720 Implemented
IA0492 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $755 $1,617 Implemented