IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,570

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0215 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $222,700 $184,000 Implemented
DL0215 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,640 $3,000 Implemented
WV0636 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,625 $18,739 Implemented
WV0636 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,868 $465 Implemented
WV0636 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $1,927 $2,021 Implemented
WV0636 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $670 $78 Implemented
WV0636 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $299 $465 Implemented
WV0636 # 08 Y:2022 08 2022 DEVELOP A REPAIR/REPLACE POLICY $217 $598 Implemented
TR0029 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,939 $24,345 Implemented
TR0029 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,047 $5,000 Implemented
AM0862 # 01 Y:2023 01 2023 REPAIR OR REPLACE STEAM TRAPS $80,175 $8,170 Implemented
AM0862 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $27,516 $41,926 Implemented
AM0862 # 03 Y:2023 03 2023 REPAIR AND ELIMINATE STEAM LEAKS $18,325 $6,300 Implemented
AM0862 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,080 $16,563 Implemented
AM0862 # 06 Y:2023 06 2023 REDUCE EXCESSIVE BOILER BLOWDOWN $1,203 $4,750 Implemented
UA0262 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,023 $44,464 Implemented
UA0262 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $2,699 $2,060 Implemented
UA0262 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,104 $4,929 Implemented
UL2211 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,815 $0 Implemented
UL2211 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $61,887 $45,461 Implemented
UL2211 # 07 Y:2022 07 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,765 $0 Implemented
MU0004 # 01 Y:2022 01 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,123 $0 Implemented
MU0004 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,089 $4,922 Implemented
MU0004 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $845 $2,773 Implemented
MU0004 # 05 Y:2022 05 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $250 $0 Implemented