IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0950 # 10 Y:2016 10 2016 DEVELOP A REPAIR/REPLACE POLICY $240 $460 Implemented
UD0950 # 11 Y:2016 11 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $335 $1,000 Implemented
UD0950 # 12 Y:2016 12 2016 OPTIMIZE PLANT POWER FACTOR $1,295 $6,540 Not Implemented
UD0950 # 13 Y:2016 13 2016 CONTRACT A WOOD PALLET RECYCLING COMPANY $7,880 $0 Implemented
SD0541 # 01 Y:2016 01 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $51,914 $30,240 Not Implemented
SD0541 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,692 $1,454 Implemented
SD0541 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,995 $4,078 Implemented
SD0541 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $976 $324 Implemented
SD0541 # 05 Y:2016 05 2016 UPGRADE CONTROLS ON COMPRESSORS $13,025 $17,000 Implemented
SD0541 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,362 $200 Not Implemented
SD0541 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,385 $2,800 Implemented
SD0541 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,632 $12,913 Implemented
SD0541 # 09 Y:2016 09 2016 USE PHOTOCELL CONTROLS $6,061 $14,800 Implemented
SD0541 # 10 Y:2016 10 2016 INSTALL TIMERS AND/OR THERMOSTATS $7,037 $270 Implemented
SD0541 # 11 Y:2016 11 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,842 $1,098 Implemented
OK0940 # 01 Y:2016 01 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,811 $17,000 Not Implemented
OK0940 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,586 $7,700 Not Implemented
OK0940 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,231 $2,782 Implemented
OK0940 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,330 $17,442 Not Implemented
OK0940 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,509 $14,500 Not Implemented
OK0940 # 06 Y:2016 06 2016 INSTALL SET-BACK TIMERS $1,433 $1,280 Implemented
OK0940 # 07 Y:2016 07 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,268 $4,752 Not Implemented
OK0940 # 08 Y:2016 08 2016 OPTIMIZE PLANT POWER FACTOR $5,900 $38,500 Not Implemented
OK0940 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,700 $1,000 Implemented
LE0419 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,334 $1,000 Implemented