Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,415
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0082 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,792 | $280 | Implemented |
WM0082 # 06 Y:2016 | 06 | 2016 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $5,896 | $2,068 | Not Implemented |
WM0082 # 07 Y:2016 | 07 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,050 | $1,650 | Not Implemented |
WM0082 # 08 Y:2016 | 08 | 2016 | USE SYNTHETIC LUBRICANT | $2,423 | $9,400 | Not Implemented |
UD0943 # 01 Y:2016 | 01 | 2016 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $32,216 | $700 | Not Implemented |
UD0943 # 02 Y:2016 | 02 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $26,548 | $2,400 | Implemented |
UD0943 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,300 | $0 | Implemented |
UD0943 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $620 | $0 | Implemented |
UD0943 # 05 Y:2016 | 05 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $196 | $800 | Not Implemented |
UD0943 # 06 Y:2016 | 06 | 2016 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $24,866 | $81,180 | Not Implemented |
UD0943 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,294 | $4,525 | Not Implemented |
UD0943 # 08 Y:2016 | 08 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $411 | $2,031 | Not Implemented |
UD0943 # 09 Y:2016 | 09 | 2016 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $12,350 | $0 | Not Implemented |
SD0523 # 01 Y:2016 | 01 | 2016 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $38,152 | $147,781 | Implemented |
SD0523 # 02 Y:2016 | 02 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $17,463 | $69,877 | Implemented |
SD0523 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,883 | $11,174 | Implemented |
SD0523 # 04 Y:2016 | 04 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $11,728 | $24,400 | Implemented |
SD0523 # 05 Y:2016 | 05 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,236 | $1,000 | Implemented |
SD0523 # 06 Y:2016 | 06 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,188 | $1,500 | Implemented |
SD0523 # 07 Y:2016 | 07 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,341 | $700 | Implemented |
SD0523 # 08 Y:2016 | 08 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,304 | $3,171 | Implemented |
SD0523 # 09 Y:2016 | 09 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $845 | $36 | Implemented |
BD0477 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,854 | $42,330 | Not Implemented |
BD0477 # 02 Y:2016 | 02 | 2016 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $12,472 | $8,000 | Not Implemented |
BD0477 # 03 Y:2016 | 03 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $8,451 | $20,000 | Not Implemented |