IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,054

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0950 # 06 Y:2016 06 2016 REDUCE EXCESSIVE BOILER BLOWDOWN $195 $0 Not Implemented
UD0950 # 07 Y:2016 07 2016 INSTALL AUTOMATIC STACK DAMPER $424 $484 Not Implemented
UD0950 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $4,004 $1,452 Not Implemented
UD0950 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,530 $4,047 Not Implemented
UD0950 # 10 Y:2016 10 2016 DEVELOP A REPAIR/REPLACE POLICY $240 $460 Implemented
UD0950 # 11 Y:2016 11 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $335 $1,000 Implemented
UD0950 # 12 Y:2016 12 2016 OPTIMIZE PLANT POWER FACTOR $1,295 $6,540 Not Implemented
UD0950 # 13 Y:2016 13 2016 CONTRACT A WOOD PALLET RECYCLING COMPANY $7,880 $0 Implemented
UD0943 # 01 Y:2016 01 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $32,216 $700 Not Implemented
UD0943 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,548 $2,400 Implemented
UD0943 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,300 $0 Implemented
UD0943 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $0 Implemented
UD0943 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $196 $800 Not Implemented
UD0943 # 06 Y:2016 06 2016 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $24,866 $81,180 Not Implemented
UD0943 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,294 $4,525 Not Implemented
UD0943 # 08 Y:2016 08 2016 DEVELOP A REPAIR/REPLACE POLICY $411 $2,031 Not Implemented
UD0943 # 09 Y:2016 09 2016 CONTRACT A WOOD PALLET RECYCLING COMPANY $12,350 $0 Not Implemented
UD0940 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,751 $0 Implemented
UD0940 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,203 $0 Implemented
UD0940 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $15,056 $750 Not Implemented
UD0940 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,308 $0 Implemented
UD0940 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $4,195 $1,683 Not Implemented
UD0940 # 06 Y:2016 06 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,717 $1,500 Implemented
UD0940 # 07 Y:2016 07 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,236 $5,400 Not Implemented
UD0940 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,111 $29 Implemented