Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
71
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0719 # 03 Y:2019 | 03 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,031 | $9,861 | Implemented |
OR0719 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,576 | $12,018 | Implemented |
OR0719 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $7,063 | $6,896 | Implemented |
OR0702 # 01 Y:2018 | 01 | 2018 | MAINTAIN CLEAN CONDITIONS BEFORE PAINTING | $20,800 | $7,140 | Not Implemented |
OR0702 # 02 Y:2018 | 02 | 2018 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $5,088 | $660 | Not Implemented |
OR0702 # 03 Y:2018 | 03 | 2018 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,409 | $1,005 | Not Implemented |
OR0702 # 04 Y:2018 | 04 | 2018 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,065 | $5,807 | Not Implemented |
OR0673 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,117 | $5,344 | Implemented |
OR0673 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $4,333 | $229 | Not Implemented |
OR0673 # 02 Y:2016 | 02 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $102,571 | $10,390 | Not Implemented |
OR0673 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $157,793 | $301,613 | Not Implemented |
OR0673 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,464 | $0 | Implemented |
OR0593 # 05 Y:2012 | 05 | 2012 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $8,590 | $34,684 | Not Implemented |
OR0593 # 04 Y:2012 | 04 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $930 | $2,250 | Not Implemented |
OR0593 # 03 Y:2012 | 03 | 2012 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $2,514 | $900 | Not Implemented |
OR0593 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,751 | $4,751 | Implemented |
OR0593 # 01 Y:2012 | 01 | 2012 | USE MORE EFFICIENT ADHESIVE APPLICATORS | $72,379 | $43,800 | Not Implemented |
OR0588 # 06 Y:2012 | 06 | 2012 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $631 | $4,131 | Not Implemented |
OR0588 # 01 Y:2012 | 01 | 2012 | IMPROVE HANDLING PRACTICES | $7,884 | $60 | Implemented |
OR0588 # 02 Y:2012 | 02 | 2012 | AVOID FROST FORMATION ON EVAPORATORS | $8,968 | $0 | Not Implemented |
OR0588 # 03 Y:2012 | 03 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,021 | $10,000 | Not Implemented |
OR0588 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,053 | $8,053 | Implemented |
OR0588 # 05 Y:2012 | 05 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $17,738 | $17,500 | Implemented |
UW0029 # 01 Y:2009 | 01 | 2009 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $13,416 | $120,000 | Implemented |
UW0029 # 02 Y:2009 | 02 | 2009 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $10,263 | $17,000 | Implemented |