IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0453 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $570 $530 Not Implemented
IA0453 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $678 $81 Implemented
IA0453 # 09 Y:2010 09 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,215 $3,400 Implemented
IA0452 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $509 $20 Implemented
IA0452 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $244 $285 Implemented
IA0452 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,308 $98 Implemented
IA0452 # 04 Y:2010 04 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,118 $824 Not Implemented
IA0452 # 05 Y:2010 05 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $482 $769 Implemented
IA0452 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,217 $60 Implemented
IA0452 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,294 $8,619 Implemented
IA0452 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $1,246 $1,600 Implemented
IA0446 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,768 $5,819 Implemented
IA0446 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,189 $29,591 Implemented
IA0446 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,951 $12,486 Implemented
IA0446 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,368 $32,570 Implemented
IA0446 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $374 $876 Implemented
IA0446 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,146 $268 Implemented
IA0446 # 07 Y:2009 07 2009 COVER OPEN TANKS $26,317 $20,000 Not Implemented
IA0446 # 08 Y:2009 08 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $23,136 $15,000 Not Implemented
IA0446 # 09 Y:2009 09 2009 INSULATE BARE EQUIPMENT $4,474 $3,180 Not Implemented
IA0446 # 10 Y:2009 10 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,136 $740 Implemented
IA0446 # 11 Y:2009 11 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,917 $1,860 Not Implemented
IA0446 # 12 Y:2009 12 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,241 $15 Not Implemented
IA0446 # 13 Y:2009 13 2009 RECOVER WASTE HEAT FROM EQUIPMENT $21,403 $1,860 Not Implemented
IA0446 # 14 Y:2009 14 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $505 $1,000 Not Implemented