IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,334

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0311 # 09 Y:2003 09 2003 OPTIMIZE PLANT POWER FACTOR $20,493 $13,500 Implemented
IA0311 # 10 Y:2003 10 2003 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $20,800 $5,500 Not Implemented
UD0661 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $37,700 $25,000 Not Implemented
UD0661 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,395 $144,000 Not Implemented
UD0661 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,827 $18,100 Not Implemented
UD0661 # 04 Y:2003 04 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,298 $0 Not Implemented
UD0661 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,118 $4,730 Not Implemented
UD0661 # 06 Y:2003 06 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,028 $0 Not Implemented
UD0661 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,953 $4,602 Not Implemented
UD0661 # 08 Y:2003 08 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,620 $0 Not Implemented
UD0661 # 09 Y:2003 09 2003 UPGRADE CONTROLS ON COMPRESSORS $1,624 $0 Not Implemented
UD0661 # 10 Y:2003 10 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,325 $0 Not Implemented
UD0661 # 11 Y:2003 11 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,059 $1,513 Not Implemented
UD0661 # 12 Y:2003 12 2003 DISCONNECT BALLASTS $811 $45 Not Implemented
UD0661 # 13 Y:2003 13 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $663 $375 Not Implemented
WI0436 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,363 $102,600 Not Implemented
WI0436 # 02 Y:2003 02 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,768 $200 Not Implemented
WI0436 # 03 Y:2003 03 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,276 $1,424 Not Implemented
WI0436 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $861 $800 Not Implemented
WI0436 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $496 $225 Not Implemented
WI0436 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $212 $272 Not Implemented
WI0436 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $119 $34 Implemented
UM0224 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,438 $21,682 Not Implemented
UM0224 # 02 Y:2003 02 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,265 $700 Not Implemented
UM0224 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $21,643 $15,930 Implemented