IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0339 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,853 $20,000 Implemented
NC0339 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,136 $1,407 Implemented
NC0339 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,369 $50 Implemented
WV0340 # 01 Y:2006 01 2006 REPAIR OR REPLACE STEAM TRAPS $80,134 $2,500 Implemented
WV0340 # 02 Y:2006 02 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $42,375 $27,500 Implemented
WV0340 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,539 $29,343 Not Implemented
WV0340 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $8,729 $2,605 Implemented
WV0340 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $4,797 $1,520 Not Implemented
WV0340 # 06 Y:2006 06 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,647 $6,520 Not Implemented
WV0340 # 07 Y:2006 07 2006 USE SYNTHETIC LUBRICANT $3,001 $90 Implemented
WV0340 # 08 Y:2006 08 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,647 $1,000 Implemented
WV0340 # 09 Y:2006 09 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,384 $800 Implemented
WV0340 # 10 Y:2006 10 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,262 $0 Implemented
WV0340 # 11 Y:2006 11 2006 DEVELOP A REPAIR/REPLACE POLICY $2,152 $439 Implemented
WV0340 # 12 Y:2006 12 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $928 $1,270 Implemented
WV0340 # 13 Y:2006 13 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $598 $1,170 Implemented
NC0316 # 01 Y:2005 01 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,271 $87,125 Not Implemented
NC0316 # 02 Y:2005 02 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,570 $26,949 Not Implemented
NC0316 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $491 $321 Not Implemented
NC0316 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $327 $100 Implemented
NC0306 # 01 Y:2004 01 2004 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $96,975 $360,700 Not Implemented
NC0306 # 02 Y:2004 02 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $86,931 $100,000 n/a
NC0306 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $7,527 $1,600 Implemented
NC0306 # 04 Y:2004 04 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $10,305 $5,000 Implemented
NC0306 # 05 Y:2004 05 2004 OPERATE BOILERS ON HIGH FIRE SETTING $6,289 $2,100 Not Implemented