Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
658
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0614 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $318 | $600 | Implemented |
SD0590 # 01 Y:2019 | 01 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $12,001 | $8,840 | Not Implemented |
SD0590 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,948 | $0 | Implemented |
SD0590 # 03 Y:2019 | 03 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $880 | $120 | Implemented |
SD0590 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $319 | $585 | Implemented |
SF0547 # 06 Y:2019 | 06 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,127 | $1,647 | Implemented |
SF0547 # 01 Y:2019 | 01 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $34,284 | $0 | Implemented |
SF0547 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,962 | $360 | Implemented |
SF0547 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,625 | $240 | Implemented |
SF0547 # 04 Y:2019 | 04 | 2019 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $8,499 | $960 | Not Implemented |
SF0547 # 05 Y:2019 | 05 | 2019 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $40,841 | $4,800 | Not Implemented |
SF0547 # 07 Y:2019 | 07 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,069 | $7,542 | Not Implemented |
SF0547 # 08 Y:2019 | 08 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $17,743 | $33,601 | Implemented |
SF0547 # 09 Y:2019 | 09 | 2019 | INSULATE BARE EQUIPMENT | $3,114 | $6,574 | Implemented |
SF0547 # 10 Y:2019 | 10 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $120,071 | $1,107,885 | Not Implemented |
SD0586 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $57,437 | $117,800 | Implemented |
SD0586 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,164 | $24,783 | Implemented |
SD0586 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,548 | $17,875 | Implemented |
SD0586 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,460 | $0 | Implemented |
SD0586 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $1,882 | $330 | Implemented |
SD0586 # 06 Y:2019 | 06 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,834 | $2,795 | Implemented |
SD0586 # 07 Y:2019 | 07 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $1,750 | $350 | Implemented |
SD0586 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,943 | $750 | Not Implemented |
SD0584 # 01 Y:2019 | 01 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,249 | $11,435 | Not Implemented |
SD0584 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,045 | $300 | Implemented |