IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

390

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0109 # 07 Y:2005 07 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $828 $0 Not Implemented
MI0109 # 08 Y:2005 08 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $685 $156 Not Implemented
MI0109 # 09 Y:2005 09 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,606 $23,253 Not Implemented
OK0712 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,981 $11,356 Not Implemented
OK0712 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,669 $7,920 Not Implemented
OK0712 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,357 $23,560 Not Implemented
OK0712 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $672 $1,820 Not Implemented
OK0712 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,800 $5,000 Not Implemented
OK0712 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $39,487 $48,800 Not Implemented
OK0712 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,142 $860 Not Implemented
OK0712 # 08 Y:2005 08 2005 $4,000 $3,000 Not Implemented
OK0712 # 09 Y:2005 09 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,026 $3,377 Not Implemented
OK0712 # 10 Y:2005 10 2005 INSTALL TIMERS AND/OR THERMOSTATS $1,512 $660 Not Implemented
OK0712 # 11 Y:2005 11 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,871 $1,327 Not Implemented
OK0712 # 12 Y:2005 12 2005 $7,801 $0 Not Implemented
NC0316 # 01 Y:2005 01 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,271 $87,125 Not Implemented
NC0316 # 02 Y:2005 02 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,570 $26,949 Not Implemented
NC0316 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $491 $321 Not Implemented
NC0316 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $327 $100 Implemented
SD0366 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,915 $3,400 Not Implemented
SD0366 # 02 Y:2005 02 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,670 $75 Implemented
SD0366 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $1,553 $200 Not Implemented
SD0366 # 04 Y:2005 04 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,250 $160 Implemented
SD0366 # 05 Y:2005 05 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,172 $900 Not Implemented
SD0366 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $695 $0 Implemented