Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,610
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0563 # 07 Y:2024 | 07 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,332 | $2,425 | n/a |
SU0563 # 08 Y:2024 | 08 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $328 | $1,597 | n/a |
SU0563 # 09 Y:2024 | 09 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $40,498 | $249,040 | n/a |
SU0563 # 10 Y:2024 | 10 | 2024 | USE HEAT PUMP FOR SPACE CONDITIONING | $10,607 | $70,800 | n/a |
SU0563 # 11 Y:2024 | 11 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,940 | $773,422 | n/a |
UD1097 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $63,287 | $0 | n/a |
UD1097 # 02 Y:2025 | 02 | 2025 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,598 | $104 | n/a |
UD1097 # 03 Y:2025 | 03 | 2025 | MINIMIZE WATER USAGE | $1,616 | $0 | n/a |
UD1097 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,568 | $0 | n/a |
UD1097 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $471 | $320 | n/a |
UD1097 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $400 | $900 | n/a |
UD1097 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $296 | $0 | n/a |
UD1097 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,220 | $14,406 | n/a |
UD1097 # 09 Y:2025 | 09 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,544 | $0 | n/a |
MS0443 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,318 | $433,405 | n/a |
MS0443 # 02 Y:2024 | 02 | 2024 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $51,282 | $1,786,854 | n/a |
MS0443 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,762 | $50,000 | n/a |
MU0060 # 01 Y:2025 | 01 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $328 | $0 | n/a |
MU0060 # 02 Y:2025 | 02 | 2025 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $126,131 | $8,400 | n/a |
MU0060 # 03 Y:2025 | 03 | 2025 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $1,517 | $1,184 | n/a |
MU0060 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,778 | $24,085 | n/a |
MU0060 # 05 Y:2025 | 05 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $76,249 | $151,800 | n/a |
MU0060 # 06 Y:2025 | 06 | 2025 | USE AUTOMATIC CLEANING EQUIPMENT | $44,873 | $110,000 | n/a |
MU0060 # 07 Y:2025 | 07 | 2025 | USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING | $1,733 | $5,000 | n/a |
MU0060 # 08 Y:2025 | 08 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,220 | $5,000 | n/a |