IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,610

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0563 # 07 Y:2024 07 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,332 $2,425 n/a
SU0563 # 08 Y:2024 08 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $328 $1,597 n/a
SU0563 # 09 Y:2024 09 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $40,498 $249,040 n/a
SU0563 # 10 Y:2024 10 2024 USE HEAT PUMP FOR SPACE CONDITIONING $10,607 $70,800 n/a
SU0563 # 11 Y:2024 11 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $57,940 $773,422 n/a
UD1097 # 01 Y:2025 01 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $63,287 $0 n/a
UD1097 # 02 Y:2025 02 2025 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,598 $104 n/a
UD1097 # 03 Y:2025 03 2025 MINIMIZE WATER USAGE $1,616 $0 n/a
UD1097 # 04 Y:2025 04 2025 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,568 $0 n/a
UD1097 # 05 Y:2025 05 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $471 $320 n/a
UD1097 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $900 n/a
UD1097 # 07 Y:2025 07 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $296 $0 n/a
UD1097 # 08 Y:2025 08 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,220 $14,406 n/a
UD1097 # 09 Y:2025 09 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,544 $0 n/a
MS0443 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $31,318 $433,405 n/a
MS0443 # 02 Y:2024 02 2024 INSTALL AN UNINTERUPTABLE POWER SUPPLY $51,282 $1,786,854 n/a
MS0443 # 03 Y:2024 03 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,762 $50,000 n/a
MU0060 # 01 Y:2025 01 2025 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $328 $0 n/a
MU0060 # 02 Y:2025 02 2025 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $126,131 $8,400 n/a
MU0060 # 03 Y:2025 03 2025 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,517 $1,184 n/a
MU0060 # 04 Y:2025 04 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,778 $24,085 n/a
MU0060 # 05 Y:2025 05 2025 UPGRADE OBSOLETE EQUIPMENT $76,249 $151,800 n/a
MU0060 # 06 Y:2025 06 2025 USE AUTOMATIC CLEANING EQUIPMENT $44,873 $110,000 n/a
MU0060 # 07 Y:2025 07 2025 USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING $1,733 $5,000 n/a
MU0060 # 08 Y:2025 08 2025 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,220 $5,000 n/a