IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0578 # 04 Y:2019 04 2019 USE EVAPORATION TO CONCENTRATE MATERIAL $6,422 $11,000 Not Implemented
WV0578 # 05 Y:2019 05 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,104 $3,500 Implemented
WV0578 # 06 Y:2019 06 2019 DEVELOP A REPAIR/REPLACE POLICY $5,469 $692 Implemented
WV0578 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,576 $3,000 Not Implemented
WV0578 # 08 Y:2019 08 2019 MINIMIZE WATER USAGE $1,375 $700 Not Implemented
WV0578 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,217 $46 Implemented
WV0578 # 10 Y:2019 10 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $174 $221 Implemented
WV0577 # 01 Y:2019 01 2019 UPGRADE CONTROLS ON COMPRESSORS $20,384 $16,000 Not Implemented
WV0577 # 02 Y:2019 02 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $11,817 $1,000 Implemented
WV0577 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,672 $25,000 Not Implemented
WV0577 # 04 Y:2019 04 2019 DEVELOP A REPAIR/REPLACE POLICY $9,446 $1,823 Implemented
WV0577 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,439 $0 Implemented
WV0577 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,313 $5,306 Implemented
WV0577 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,553 $24,100 Not Implemented
WV0577 # 08 Y:2019 08 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,256 $0 Implemented
WV0577 # 09 Y:2019 09 2019 MINIMIZE WATER USAGE $931 $1,400 Not Implemented
TR0012 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $5,267 $1,049 Implemented
TR0012 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,120 $5,616 Implemented
TR0012 # 03 Y:2019 03 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,664 $6,310 Implemented
TR0012 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230 $296 Implemented
AM0781 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,349 $43 Not Implemented
AM0781 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $6,054 $17,860 Not Implemented
AM0781 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,710 $7,720 Implemented
AM0781 # 04 Y:2019 04 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $805 $762 Not Implemented
AM0781 # 05 Y:2019 05 2019 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $445 $780 Implemented