IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,054

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0585 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,658 $9,998 Implemented
WV0585 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,160 $1,100 Implemented
WV0585 # 08 Y:2019 08 2019 DEVELOP A REPAIR/REPLACE POLICY $5,125 $1,450 Implemented
WV0585 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,529 $250 Not Implemented
WV0585 # 10 Y:2019 10 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,014 $1,303 Implemented
WV0578 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $49,796 $9,417 Not Implemented
WV0578 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $13,935 $4,000 Not Implemented
WV0578 # 03 Y:2019 03 2019 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,677 $17,920 Not Implemented
WV0578 # 04 Y:2019 04 2019 USE EVAPORATION TO CONCENTRATE MATERIAL $6,422 $11,000 Not Implemented
WV0578 # 05 Y:2019 05 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,104 $3,500 Implemented
WV0578 # 06 Y:2019 06 2019 DEVELOP A REPAIR/REPLACE POLICY $5,469 $692 Implemented
WV0578 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,576 $3,000 Not Implemented
WV0578 # 08 Y:2019 08 2019 MINIMIZE WATER USAGE $1,375 $700 Not Implemented
WV0578 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,217 $46 Implemented
WV0578 # 10 Y:2019 10 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $174 $221 Implemented
UD0994 # 01 Y:2019 01 2019 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $100,170 $0 Not Implemented
UD0994 # 02 Y:2019 02 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,091 $700 Not Implemented
UD0994 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,649 $33,788 Not Implemented
UD0994 # 04 Y:2019 04 2019 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $248,034 $337,264 Implemented
UD0994 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,349 $10,250 Not Implemented
UD0994 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,968 $8,550 Not Implemented
WV0566 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,590 $114,000 Not Implemented
WV0566 # 02 Y:2018 02 2018 DEVELOP A REPAIR/REPLACE POLICY $4,621 $945 Implemented
WV0566 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,255 $600 Implemented
WV0566 # 04 Y:2018 04 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,029 $500 Implemented