Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

95

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2206 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,272 $2,688 Implemented
LS2206 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $21 $25 Not Implemented
LS2206 # 04 Y:2022 04 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $336 $250 Implemented
LS2206 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,014 $25 Implemented
LS2206 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,034 $630 Implemented
LS2206 # 01 Y:2022 01 2022 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,066 $10 Implemented
LS2103 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,154 $39,829 Implemented
LS2103 # 05 Y:2021 05 2021 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $209,892 $1,023,215 Implemented
LS2103 # 01 Y:2021 01 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $35,907 $250 Implemented
LS2103 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,807 $428 Implemented
LS2103 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,440 $900 Implemented
LS2006 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $31 $45 Not Implemented
LS2006 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,970 $1,800 Implemented
LS2006 # 07 Y:2020 07 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,737 $81,000 Not Implemented
LS2006 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $566 $375 Implemented
LS2006 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $796 $300 Implemented
LS2006 # 06 Y:2020 06 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,553 $7,413 Not Implemented
LS2006 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,740 $0 Implemented
LS2005 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $274 $0 Implemented
LS2005 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $114 $50 Not Implemented
LS2005 # 06 Y:2020 06 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $225,476 $1,204,486 Not Implemented
LS2005 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,560 $0 Implemented
LS2005 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,727 $300 Not Implemented
LS2005 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,208 $17,766 Not Implemented
AM0613 # 06 Y:2012 06 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $694 $108 Implemented