Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
564
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0936 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,227 | $30,000 | n/a |
AM0936 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $104,000 | $115,000 | n/a |
AM0936 # 05 Y:2025 | 05 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $26,345 | $418,850 | n/a |
AM0936 # 03 Y:2025 | 03 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $45,840 | $1,490 | n/a |
AM0936 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $62,000 | $644,000 | n/a |
AM0936 # 04 Y:2025 | 04 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $35,490 | $397,200 | n/a |
TR0058 # 04 Y:2023 | 04 | 2023 | METER WASTE WATER | $408 | $1,511 | n/a |
TR0058 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,706 | $7,350 | n/a |
TR0058 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $727 | $2,781 | n/a |
TR0058 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,832 | $216,216 | n/a |
NT0027 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,267 | $5,347 | Not Implemented |
NT0027 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,456 | $5,609 | Implemented |
NT0027 # 05 Y:2024 | 05 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,408 | $3,040 | Not Implemented |
NT0027 # 03 Y:2024 | 03 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,335 | $0 | Implemented |
NT0027 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $2,533 | $1,946 | Not Implemented |
NT0021 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,801 | $7,120 | Implemented |
NT0021 # 06 Y:2024 | 06 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $16,970 | $0 | Implemented |
NT0021 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,821 | $5,609 | Not Implemented |
NT0021 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,153 | $11,393 | Implemented |
NT0021 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,130 | $0 | Implemented |
NT0021 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $19,175 | $6,411 | Not Implemented |
NT0021 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $88,000 | $94,845 | Not Implemented |
NT0021 # 07 Y:2024 | 07 | 2024 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $21,290 | $19,507 | Not Implemented |
AM0892 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $255 | $1,000 | n/a |
AM0892 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $248 | $800 | n/a |