Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
508
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0101 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,340 | $8,800 | Implemented |
MZ0101 # 01 Y:2012 | 01 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,105 | $1,160 | Implemented |
MZ0101 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $290 | $360 | Implemented |
MZ0101 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $199 | $297 | Implemented |
MZ0101 # 02 Y:2012 | 02 | 2012 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $934 | $4,969 | Not Implemented |
IA0491 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,631 | $600 | Implemented |
IA0491 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,510 | $18,286 | Implemented |
IA0491 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $2,096 | $2,626 | Implemented |
IA0491 # 02 Y:2012 | 02 | 2012 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,278 | $530 | Not Implemented |
IA0491 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,619 | $10,841 | Implemented |
IA0491 # 06 Y:2012 | 06 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $363 | $175 | Implemented |
MA0703 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,220 | $4,900 | Not Implemented |
MA0703 # 05 Y:2012 | 05 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,040 | $2,080 | Not Implemented |
MA0703 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,254 | $100 | Implemented |
MA0703 # 08 Y:2012 | 08 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $803 | $1,200 | Not Implemented |
MA0703 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,371 | $2,930 | Not Implemented |
MA0703 # 03 Y:2012 | 03 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,287 | $6,060 | Not Implemented |
MA0703 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,359 | $5,625 | Not Implemented |
MA0703 # 01 Y:2012 | 01 | 2012 | OPTIMIZE PLANT POWER FACTOR | $10,588 | $9,425 | Implemented |
MA0703 # 09 Y:2012 | 09 | 2012 | TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS | $332 | $150 | Implemented |
MI0232 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $53,657 | $2,600 | Implemented |
MI0232 # 02 Y:2012 | 02 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $34,023 | $480 | Implemented |
MI0232 # 03 Y:2012 | 03 | 2012 | OPTIMIZE PLANT POWER FACTOR | $12,172 | $9,640 | Implemented |
MI0232 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,493 | $80 | Implemented |
MI0232 # 09 Y:2012 | 09 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,079 | $3,331 | Implemented |