IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,174

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0236 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,254 $1,975 Implemented
UD1099 # 01 Y:2025 01 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,391 $0 Implemented
UD1099 # 04 Y:2025 04 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $568 $0 Implemented
UD1099 # 08 Y:2025 08 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $283 $953 Implemented
UD1098 # 07 Y:2025 07 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $513 $0 Implemented
UD1098 # 04 Y:2025 04 2025 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,612 $306 Implemented
UD1098 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $715 $1,235 Implemented
SU0563 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,490 $0 Implemented
SU0563 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,699 $2,100 Implemented
SU0563 # 05 Y:2024 05 2024 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,466 $500 Implemented
SU0563 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,793 $26,262 Implemented
IC0314 # 10 Y:2024 10 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,150 $4,200 Implemented
IC0314 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,527 $0 Implemented
IC0314 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,286 $160 Implemented
IC0314 # 06 Y:2024 06 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,212 $376 Implemented
IC0314 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,007 $683 Implemented
IC0314 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,076 $0 Implemented
WV0671 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,904 $15,193 Implemented
UF0622 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,345 $12,420 Implemented
UF0622 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $13,853 $3,888 Implemented
UF0622 # 12 Y:2024 12 2024 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $3,200 $3,200 Implemented
UF0622 # 08 Y:2024 08 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,035 $0 Implemented
UF0622 # 07 Y:2024 07 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $5,875 $6,148 Implemented
UF0622 # 10 Y:2024 10 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $46,005 $0 Implemented
UF0622 # 11 Y:2024 11 2024 IMPROVE SPACE COMFORT CONDITIONING $30,240 $788 Implemented