IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,149

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0671 # 13 Y:2024 13 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $768 $176 Implemented
UF0622 # 10 Y:2024 10 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $46,005 $0 Implemented
WV0671 # 05 Y:2024 05 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,906 $5,200 Implemented
UF0622 # 11 Y:2024 11 2024 IMPROVE SPACE COMFORT CONDITIONING $30,240 $788 Implemented
WV0671 # 08 Y:2024 08 2024 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,623 $1,200 Implemented
UF0622 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,345 $12,420 Implemented
WV0671 # 09 Y:2024 09 2024 DEVELOP A REPAIR/REPLACE POLICY $3,020 $1,180 Implemented
UF0622 # 07 Y:2024 07 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $5,875 $6,148 Implemented
UF0622 # 12 Y:2024 12 2024 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $3,200 $3,200 Implemented
WV0671 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,904 $15,193 Implemented
UF0622 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $13,853 $3,888 Implemented
UF0622 # 08 Y:2024 08 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,035 $0 Implemented
WV0671 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,306 $17,145 Implemented
WV0671 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $16,714 $10,679 Implemented
WV0671 # 06 Y:2024 06 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,058 $5,330 Implemented
WV0671 # 12 Y:2024 12 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $799 $1,648 Implemented
WV0671 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $3,901 $6,364 Implemented
UD1093 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,522 $2,450 Implemented
UD1093 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,442 $953 Implemented
LE0582 # 03 Y:2024 03 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,934 $5,000 Implemented
LE0582 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,259 $2,600 Implemented
LE0582 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $2,331 $1,140 Implemented
LE0582 # 09 Y:2024 09 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,102 $5,494 Implemented
LE0582 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $612 $0 Implemented
NL0097 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,785 $3,750 Implemented