IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,003

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0542 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,383 $0 Implemented
MA0542 # 06 Y:2003 06 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,232 $500 Implemented
BD0248 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,140 $23,175 Implemented
BD0248 # 04 Y:2003 04 2003 USE RADIANT HEATER FOR SPOT HEATING $4,072 $5,000 Implemented
BD0248 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,847 $4,555 Implemented
BD0248 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,760 $1,000 Implemented
BD0248 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,492 $0 Implemented
BD0248 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $663 $600 Implemented
BD0248 # 11 Y:2003 11 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $439 $175 Implemented
BD0248 # 15 Y:2003 15 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $28,938 $3,000 Implemented
TA0065 # 01 Y:2003 01 2003 REDESIGN PROCESS $75,086 $0 Implemented
TA0065 # 02 Y:2003 02 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $64,800 $5,200 Implemented
TA0065 # 05 Y:2003 05 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,900 $0 Implemented
TA0065 # 06 Y:2003 06 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,426 $6,000 Implemented
TA0065 # 07 Y:2003 07 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,793 $0 Implemented
TA0065 # 08 Y:2003 08 2003 MOVE BOILER TO MORE EFFICIENT LOCATION $1,422 $1,894 Implemented
TA0065 # 09 Y:2003 09 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $306 $140 Implemented
NC0269 # 01 Y:2003 01 2003 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $272,200 $118,250 Implemented
NC0269 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $16,965 $5,128 Implemented
NC0269 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,974 $9,174 Implemented
NC0269 # 04 Y:2003 04 2003 DEVELOP A REPAIR/REPLACE POLICY $4,027 $1,719 Implemented
NC0269 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,654 $2,400 Implemented
BD0247 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $13,627 $1,000 Implemented
BD0247 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $13,156 $8,080 Implemented
BD0247 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,345 $35,510 Implemented