IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0803 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,070 $545 Implemented
AM0803 # 08 Y:2020 08 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $760 $500 Implemented
AM0803 # 09 Y:2020 09 2020 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $395 $115 Implemented
AM0803 # 10 Y:2020 10 2020 INSULATE BARE EQUIPMENT $340 $144 Implemented
AM0803 # 11 Y:2020 11 2020 INSULATE BARE EQUIPMENT $130 $190 Implemented
OR0736 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,946 $3,000 Implemented
OR0736 # 03 Y:2020 03 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,008 $1,549 Implemented
OR0736 # 04 Y:2020 04 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $922 $114 Implemented
LE0491 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,358 $20,000 Implemented
LE0491 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $16,658 $14,000 Implemented
LE0491 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,952 $8,712 Implemented
LS2005 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,560 $0 Implemented
LS2005 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $274 $0 Implemented
MA0814 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,788 $12,100 Implemented
MA0814 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,694 $12,100 Implemented
MA0814 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,857 $4,096 Implemented
WV0589 # 02 Y:2020 02 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $22,091 $28,000 Implemented
WV0589 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $19,827 $15,605 Implemented
WV0589 # 05 Y:2020 05 2020 OPTIMIZE PLANT POWER FACTOR $10,950 $36,000 Implemented
WV0589 # 06 Y:2020 06 2020 UPGRADE CONTROLS ON COMPRESSORS $10,700 $5,225 Implemented
WV0589 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,413 $2,438 Implemented
WV0589 # 08 Y:2020 08 2020 DEVELOP A REPAIR/REPLACE POLICY $2,587 $575 Implemented
WV0589 # 10 Y:2020 10 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,730 $1,251 Implemented
WV0589 # 11 Y:2020 11 2020 INSULATE BARE EQUIPMENT $1,270 $427 Implemented
WV0589 # 12 Y:2020 12 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,181 $75 Implemented