IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,987

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0358 # 01 Y:2014 01 2014 ELIMINATE/REDUCE AN OPERATION $347 $0 Implemented
SU0358 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $797 $590 Implemented
SU0358 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $114 Implemented
UD0895 # 01 Y:2014 01 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $72,083 $0 Implemented
UD0895 # 02 Y:2014 02 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,208 $0 Implemented
UD0895 # 03 Y:2014 03 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $48,509 $7,500 Implemented
UD0895 # 04 Y:2014 04 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,209 $0 Implemented
UD0895 # 05 Y:2014 05 2014 ADD AREA LIGHTING SWITCHES $1,613 $1,575 Implemented
UD0895 # 07 Y:2014 07 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $249 $510 Implemented
UD0895 # 08 Y:2014 08 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,823 $16,000 Implemented
UD0895 # 09 Y:2014 09 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,388 $800 Implemented
UD0895 # 10 Y:2014 10 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,520 $4,275 Implemented
UA0111 # 01 Y:2013 01 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,225 $851 Implemented
UA0111 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,878 $2,530 Implemented
UA0111 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,637 $100 Implemented
BD0438 # 01 Y:2013 01 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $257,500 $315,000 Implemented
BD0438 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $63,332 $57,300 Implemented
BD0438 # 04 Y:2013 04 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $52,832 $150,000 Implemented
BD0438 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $47,432 $30 Implemented
BD0438 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $46,324 $10,000 Implemented
BD0438 # 07 Y:2013 07 2013 REPAIR OR REPLACE STEAM TRAPS $42,432 $1,600 Implemented
BD0438 # 08 Y:2013 08 2013 REDUCE EXCESSIVE BOILER BLOWDOWN $19,230 $25,000 Implemented
BD0438 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $27,466 $20,000 Implemented
BD0438 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,975 $34,500 Implemented
BD0438 # 12 Y:2013 12 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,591 $25 Implemented